October 31, 2008

House Remodel Continues (3)

DD#1 house remodel continues ..........


Start out with neat, clean equipment.








Ceiling is ready to be stamped. Unfortunately something went wrong with the mix and ir produced these things hanging down that looked like half of a ping pong ball. No photo (sorry).















Funny thing the hallway came out perfect. Maybe a bad mix got used in the kitchen, living and dining room. Or maybe it was just way too cold outside and too warm inside. Ceiling had to be sanded off again (2nd time). I love the hallway lights DD#1 choose.












All cabinets, doors ... everything is covered with plastic to protect from paint and ceiling stamp.












Priming the walls.

































Oh boy carpet selection time. A nice Berber. The new furniture is lovely.











OK ceiling was sanded for the 2nd time, primed and restamped (2nd stamping).
















Oops big problems where the hallway meets the living/dining room. Oh dear.















Unfortunately the new stamping product and design did not turn out as expected. It's UGLY, thick and too close together. In real time it looks like embossed wallpaper from the 70's. So for the 3rd time ceiling will be sanded, primed and restamped. Third time is charm (we hope).

We can't say enough about Harrison Construction ....... they are wonderful.


Stay Tuned.





Sorry about the spacing blogger has gone crazy, I guess.

No comments: